Construction Engineering
Cost estimating
Use this for “Placing 85 m³ of concrete takes material at $165/m³ and 1.6 labor-hours per m³ at $42/h. With a 15% markup, what is the bid?”
Chart
Material: $14,025
Labor: $5,712
This is an example. Type your own values to start a new problem.
$
M
=
Q (m³)
×
uₘ ($/m³)
$
Lc
=
Q (m³)
×
p (labor-h/m³)
×
w ($/h)
$
B
=
$
D
×
(1
+
m (%)
)
Q is the quantity of work, uₘ its material cost per m³, p the labor-hours per m³ and w the wage; m is the markup on the direct cost D.
Formulas
M
=
Q
×
uₘ
14,025 = 85 × 165
Lc
=
Q
×
p
×
w
5,712 = 85 × 1.6 × 42
D
=
M
+
Lc
19,737 = 14,025 + 5,712
B
=
D
×
(1
+
m
100
)
22,698
=
19,737
×
(1
+
15
100
)
Assumptions
•
Unit costs and productivity come from the contractor’s records or a cost guide.
•
Labor-hours per m³ already allow for the crew size.
•
Equipment and indirect costs sit in the markup here.
Step-by-step
WE KNOW
Q = 85 m³, uₘ = 165 $/m³, p = 1.6 labor-h/m³, w = 42 $/h, m = 15%
FIND
material cost (M), labor cost (Lc), direct cost (D), bid price (B)
Step 1 · Find material cost (M)
Use M = Q × uₘ
Each cubic metre takes its material cost, so multiply by the quantity.
M
=
85
×
165
M
=
$14,025
Step 2 · Find labor cost (Lc)
Use Lc = Q × p × w
The quantity times the labor-hours per cubic metre is the hours worked; each hour costs the wage.
Lc = 85 × 1.6 × 42
Lc = 136 × 42
Lc = $5,712
Step 3 · Find direct cost (D)
Use D = M + Lc
The direct cost of the work is its material plus its labor.
D
=
14,025
+
5,712
D
=
$19,737
Step 4 · Find bid price (B)
Use B = D × (1 + m ÷ 100)
The
markup
adds
m
%
of
the
direct
cost
for
overhead
and
profit.
B
=
19,737
×
(1
+
15
100
)
B
=
19,737
×
(1
+
0.15)
B
=
19,737
×
1.15
B
=
$22,698
Check
Put the numbers back in. Both sides should match.
14,025 = 85 × 165 ✓
5,712 = 85 × 1.6 × 42 ✓
19,737 = 14,025 + 5,712 ✓
22,698
=
19,737
×
(1
+
15
100
)
✓
Topic check
See what you know: 5 questions on this topic
New questions each time. Pass to mark it complete.
More problem types
Cost by a cost index and a city index
Use this for “A building cost $2,400,000 when the cost index stood at 11,200. The index is 13,350 now, and the city index is 92.5. What would it cost to build there today?”
Learning curve
Use this for “A crew took 120 hours to build the first of many identical forms. On an 85% learning curve, how long does the 10th one take?”